AskEssays.com - Discover essay samples

MRP

4.9 of 5.0 (86 reviews)

Contains
834 words
Category
Other

MRP page 1
MRP page 2
MRP page 3
The above thumbnails are of reduced quality. To view the work in full quality, click download.

MRP


MRP II

While MRP I primarily address the inbound flow of inventory (materials management), MRP II adds other interfaces such as finance, marketing, and integrated logistics. Like MRP I, MRP II is a push inventory model which pushes product through manufacturing and distribution processes in order to meet forecast demand. However, it adds further dimensions to the basic model. MRP II not only considers the inbound flow of material, but also how much material can actually be handle within the plant. Furthermore, it actually handles production scheduling, labour needs, inventory budgets, and personnel needs. But the most important feature is the addition of the finance interface. This module provides the capability of transforming the operating production plans into financial terms, consequently the data can be used for financial planning and control purposes of a more general management nature. Another significant addition is the simulation module. This simulation capability enables management to perform a more comprehensive alternative planing work in developing the marketing and business plans. Operating variable could be regulated to examine the systemwide response to the proposed operating change.

Besides MRP II includes the entire set of activities involved in the planning and control of production operations. It consists of a variety of functions of modules and includes production planing, resource requirement planning, master production scheduling, materials requirements planning (MRP I), shop floor control, and purchasing.



Process of MRP II

Step 1 - Market Demand; the process begins with an aggregation demand from all sources. Examples of sources are firms' orders, forecasts, and safety stock requirements.

Step 2- Production Plan; with inputs from manufacturing, finance, and marketing, the production plan would be derived.

Step 3- Rough-cut capacity planning; it involves short-term capacity considerations that are affected by irregularities in demand. It formulates benchmarks for the proper use of personnel, machines, and shifts. Bills of capacity and bills of labour resources are the primary inputs to determine rough-cut capacity. In the event of incapability in producing the require output (due to limitation of capacity), adjustment to the production plan would be made.

Step 4- Master production schedule; formulation of the master production schedules provides a realistic, detailed, statement of what the firm expects. It is more detail than the aggregate plan, it translates the aggregate plan into specific numbers of specific products to be produced in a specific period of time.

Step 5- Material requirements planning (MRP); MRP is the heart of the entire process (MRP II). When MRP comes into play, material and schedule requirements would be generated.

Step 6- Capacity requirements planning; at this stage, the capacity requirement planning determine whether the firm has enough capacity (e.g. worker, space, money) to meet the schedules. Again, if schedules could not be met, some adjustment in the master production schedule would be required else requirements would be scheduled.



Advantages of MRP II

The advantages of MRP II includes:

- Improved consistency in one-time customer delivery

- Reduction in purchasing cost due to fewer expedited shipments

- Fewer shortage and stockouts

- Increase customer service level

- Inventory reduction of one-fourth to one-third (cost reduced)

- Higher inventory turnover

- Improve responsiveness to demand changes

- Allowing more planning flexibility

- Minimization of workforce overtime



Problems in Implementation of MRP II

Implementation an MRP II system is a monumental effort. The system requires a tremendous amount of information, which must be accurate if the system is to be successful. The MRP II systems is capable of affecting all function within Forges's marketing, production, purchasing, accounting, finance and logistic. All personnel who have any interaction with the MRP II system require training. Further, Forges must be committed to make the MRP II system work. The problems that occur in implementing MRP are frequently organizational and behavioral rather than technical.



Existing Systems and the Informal System

If an MRP II system is replacing an existing production and inventory control system, Forges may see significant resistance to change, even if the existing system has been unsatisfactory. People generally resist to change, and they prefer the familiar to the unfamiliar. Also, when a system performs poorly, an informal system develops to deal with problems.



Information Requirements

For MRP II to operate effectively, the company must have a large amount of timely and accurate data. Besides, bill of material must be developed for all items. Furthermore, all the bill of material (BOM) must be reviewed, updated, and structured that provide the data needed by MRP II. This would not be a simple task. Frequency product changes and modification can make the process of developing a BOM challenging. To maintain the integrity of the BOM, ...

You are currently seeing 50% of this paper.

You're seeing 834 words of 1667.

Keywords: mr porter, mr pub, mrpcgamer, mrp to eur, mrpopular, mrpiracy, mrpl, mrp full form

Similar essays


HOW TO Buy a Computer (A HOW T

HOW TO BUY A NEW COMPUTER Before buying a home computer, the smart shopper must first assess their computer wants and needs, do some basic research and finally, comparison-shop for the best price. First, determine how you will use the new computer system. Will you be buying it primarily for gaming and personal use, or using it as a home-ba...

87 reviews
Download
Foxwoods (gambling)

There are many reasons why people gamble and what the advantages and disadvantages are of risking your bank account on the roll of the dice or the luck of the draw. I originally set out to try and explain why people gamble, but I realized that gambling is just as much of a business or industry as anything else. I researched Foxwoods casino, i...

211 reviews
Download
Problems Encountered When Feed

There are four problems that may occur in individuals with sever disabilities when feeding is taking place. These four problems, chin retraction, tongue retraction, chin thrust, and tongue thrust, all take place in the dental region of the face, and they all involve the muscles of that same region. Each one presents its own difficulties; however,...

10 reviews
Download
Childhood Socialization

Webster's definition of socialization is '1. to make social 2. to take part in social activity." A well known definition of socialization is being exposed to race, ethnicity, and religion in an unbiased, open-minded, and positive manner. Therefore, leading one to not have any predispositions, stereotypes, or negative thoughts on any certai...

121 reviews
Download
Embracing the change

EMBRACING THE CHANGE Imagine? A planting season requiring no dangerous herbicides or toxic pesticides. Thousands of dollars saved, because nutritional supplements are now needless. A beef steer reaching market weight in 75 days. The use of medicines nearly nonexistent. Millions of human lives improved and even saved by a sheep?s mil...

156 reviews
Download
Atsisiųsti šį darbą